Maintenance of woodworking CNC Router
Continuous running time of 10 hours a day, to ensure that the cooling water clean and the normal work of the pump, can not make the water cooling spindle motor appears water shortage, regular replacement of cooling water, to prevent the water temperature is too high. Water tank inside the cooling water must be changed once a week, the weather is hot, it is recommended to use the ice. Industrial cooling CNC Router ( http://www.roc-tech.com/product/product33.html ) is recommended to use force companies to provide advice; circulating cooling water using saponification liquid;
Each time the CNC Router is used, to pay attention to clean up, be sure to clean the dust on the platform and drive system, regular (weekly) on the transmission system (X.Y.Z three axis) lubrication refueling. Guide screw available oil gun oil, add 0# grease or butter;
If the CNC Router is not used for a long time, it should be regularly (every week) to go, in order to ensure the flexibility of the transmission system.
To clean up the dust in the electric appliance box regularly (according to the usage), check whether the wiring terminal screw is loose, to ensure the safe and reliable operation of the circuit.
Regularly (according to the usage) check the CNC Router parts screw is loose, in order to ensure the reliable operation of the CNC Router.
When the maintenance of electrical equipment inspection, be sure to cut off the power supply, to monitor the main circuit is not displayed and the main circuit power indicator lights off, before the.
When power is off, the X, Y, Z three axis position can not be forcibly moved.